Mass Timber Market Updates - July 2021 - Week Twentyeight

Mass Timber Market Updates - July 2021 - Week Twentyeight

5 Minuten

Beschreibung

vor 4 Jahren

In news this week episode, Södra’s second production facility for
cross-laminated timber is scheduled for completion by mid-2022.
The facility will be able to deliver framing materials for 4,000
homes per year, which is ten times the current output of Södra’s
existing facility at Värö. Three engineered timber office towers
worth $173 million have been approved for a site in Sydney’s
Lower North Shore. The eight, 12- and 18-storey towers proposed
by Arrow Capital Partners and designed by Fitzpatrick+partners
will be built on the 7636sq m corner block at 29-57 Christie
Street, St Leonards. BOSS (Building, Offsite, Sustainable,
System) and it is a prefabricated construction solution using an
engineered timber-based structure. It uses biobased materials for
insulation, achieves Passive House certification, uses 100 per
cent electric and renewable sources of energy and resilient
materials. UK real estate firm Cromwell Property Group and
Finnish real asset manager Dasos Capital have joined to launch a
pan-European wooden building property fund. A former shopping
center near downtown Los Angeles is getting a makeover thanks to
an innovative new design that promises to take CLT building to
brand new levels. 

Production by Deeelicious Beats 
Music "Game Play" by Quality Quest
Podcast is a Mass Timber Construction Journal
Production 
www.masstimberconstruction.com 


Send us a text


Support the show

Kommentare (0)

Lade Inhalte...

Abonnenten

15
15